Home

About GNPC

Activities

Subsidiaries

Careers

Useful Links

Contact

Activities | Exploration & Production
Exploration & Production | Promotion | Data Management
Production History
Out of the seven (7) discoveries made in Ghana it is the Saltpond field that has undergone production between 1978 and 1985. A total of about 3.47 MMbo was produced and 14 Bcf of gas was flared during the period. A Production Platform “Mr. Louie” which was used for the production is still in place.

GNPC in an effort to revive the field entered into an agreement with Lushann Eternit in the year 2000.  This agreement resulted in the formation of a joint venture company - Saltpond Offshore Producing Company Ltd (SOPCL) – which is currently operating the field.

In the North and the South Tano fields, a number of appraisal wells have been drilled.  Beyond this, GNPC has carried out an extended production test in the South Tano field.  Currently, GNPC is talking to a number of oil companies to utilize the gas from these fields for power generation.  A 125 MW power barge is already available in Ghana for such a venture.
The 3-AX block is envisaged to be an additional source of gas for the Tano power generation project.

The Cape Three Points and the West Tano discoveries are yet to be appraised.

 

Sedimentry Basins
Discoveries
Production History
Current Operations
Petroleum Agreements

< Previous |Next >
News and Events
PRESS STATEMENT
11 March 2013
DISCLAIMER ACCRA, 11th March, 2013:- Our attention has been drawn to a publication on the website of Joblist Ghana (http://joblistghana.com/jobs/ghana) announcing that GNPC is accepting CVs
Read more
News Archive
Explainer DC Ghana Ltd.